Exclusive: Severfield CEO warns on £6m 'maximum' Cheesegrater bolt costs
Exclusive: Severfieldâs chief executive has warned the cost of replacing steel bolts on the Cheesegrater may rise above the £6m figure flagged with the City.
Exclusive: Severfield CEO warns on £6m ‘maximum’ Cheesegrater bolt costs
- July 30, 2015
- , 9:15 am
- , Civil & Structural Engineering