Exclusive: Severfield CEO warns on £6m ‘maximum’ Cheesegrater bolt costs

Exclusive: Severfield CEO warns on £6m 'maximum' Cheesegrater bolt costs
Exclusive: Severfield’s chief executive has warned the cost of replacing steel bolts on the Cheesegrater may rise above the £6m figure flagged with the City.

Share this post